Solugen – Houston, TX
- Plant Development and Expansion
- New Construction, Service, Maintenance, Installation, and Instrumentation
- Duration: Continual site presence since 2019
- Budget: ~$10M
- Direct to Owner
Del Monte Fresh Produce – Port of Freeport, TX
- Container Yard
- Design-Build, two acres and more than 750 shipping containers
- Duration: 8 Months
- Budget: ~$6M
- Direct to Owner
Cooper Machinery Services – Houston, TX
- Machine Shop
- Design-Build
- Duration: Ongoing for more than 20 years (multiple contracts)
- Direct To Owner
Del Monte Fresh Produce – Port of Galveston, TX
- Cold storage renovation and upgrade of refrigeration compressors and engine room
- 240,000 square feet
- Design-Build
- Duration: 3 Years
- Direct to owner
Fresno Energy – Fresno, TX
- Design-Build Methane Gas Pump Station
- Design-Build 2 Mega-watt co-generation facility
- Duration: 3 years
- Direct to owner
Advantage Pipeline Crude Oil Pump Station and Storage Facility – Crane, TX
- Ground-up construction to provide electrical power and instrumentation for pump station and crude oil tank farm
- Duration: 1 Year
- Direct to owner
Advantage Pipeline Crude Oil Pump Station and Storage Facility – Pecos, TX
- Ground-up construction to provide electrical power and instrumentation for crude oil metering/transfer stations
- Duration: 18 months
- Direct to owner
Continuum Metering Stations – Houston, TX
- Ground-up construction to provide electrical power and instrumentation for crude oil metering/transfer stations
- Duration 4 Months
- GC: PSI
Lakewood Midstream Metering Stations – Tulsa, OK
- Ground-up construction to provide electrical power and instrumentation for crude oil metering/transfer stations
- Duration 4 Months
- Direct to owner
Vitol Crude Metering and Transfer Station – Permian Basin
- Electrical and instrumentation construction for oilfield off-loading and storage facility
- Metering Skid
- Duration: 4 months
- GC: PECI, Scott, LA
Champion Technologies – Fresno, TX
- Long-term contract for chemical plant electrical construction, instrumentation maintenance, and repairs
- Major projects:
- Design-build 2-story lab building, 30,000 square feet
- Design-build maintenance building, 4,000 square feet
- Design-build lab building remodel, 15,000 square feet
- Plant 3 building expansion including 2 blend reactors and control room
- Plant 4 new construction of building and blend reactors and control room
- New tank farm electrical/instrumentation/construction and renovations
- Electrical/instrumentation/construction for EO/PO metering stations
- General electrical construction for plant, warehouses, and office facilities
- Duration: 10 years (multiple contracts)
- Direct to owner